CCCC-SHEC-6th Engineering Co., Ltd. Bosnia and Herzegovina Vc Corridor Expressway OP Section Project
Grouting Machine Local Procurement Announcement (Public Direct Procurement)
1. Inquiry Conditions
1.1 The Project Management Department of the CCCC-SHEC-6th Engineering Co., Ltd. for the Bosnia and Herzegovina Vc Corridor Expressway OP Section has obtained construction approval. The project owner is the Federation of Bosnia and Herzegovina Highway Co., Ltd., and the construction funds have been secured. The purchaser is the Project Management Department of CCCC-SHEC-6th Engineering Co., Ltd. for the Bosnia and Herzegovina Vc Corridor Expressway OP Section. The conditions for procuring grouting machines are now met, and a public single-source procurement is being conducted utilizing an electronic procurement system.
1.2 This batch of <u>grouting machines</u> is intended for the construction of the main line of the CCCC-SHEC-6th Engineering Co., Ltd. Bosnia and Herzegovina Vc Corridor Expressway OP Section Project.
1.3 The inquiry process will commence upon the release of this announcement.
2. Project Overview
The Bosnia and Herzegovina Vc Corridor Expressway OP Section Project has a main line total length of 11.985 km, constructing a new dual four-lane highway. The main project works include 3 bridges with a single-lane length of 2301.8m, 2 tunnels with a single-lane total length of 2844.56m, as well as other ancillary works such as roadbed, pavement, electromechanical and traffic safety facilities. The project technical standards comply with Bosnian and European standards. The construction period is 24 months.
Project Address: Žepče, Zenica-Doboj Canton, Bosnia and Herzegovina (Overseas)
3. Inquiry Content and Settlement
3.1 Inquiry Procurement Number: SCFA00000064694
3.2 Inquiry Content:
设备名称 |
规格型号 |
计量单位 |
暂定数量 |
暂定交货期 |
交货地点 |
备注 |
Grouting Machine |
400Nt |
台 |
1 |
September 30, 2025 |
Bosnia and Herzegovina Vc Corridor Expressway OP Section Project |
|
1、Tax Invoice Requirement: Must provide a special VAT invoice at 17%, and settlement shall be based on a single invoice system. |
||||||
2、Delivery Period: Delivery within 30 weeks after advance payment is received. |
||||||
3、Acceptance Method: Acceptance will be conducted according to the checklist. |
||||||
4、Payment Terms: 70% advance payment, the remaining 30% to be paid within 15 days after delivery of the goods. |
||||||
5、Other Requirements: Supply capacity and quality must meet the project construction needs. Warranty period is 1 year (starting from the Purchaser's acceptance of the equipment). |
4. Technical Indicators:
The provided equipment must meet Bosnian national or industry standards.
5. Bidder Qualification Requirements
5.1 Business Scope Requirements: Must be legally registered within Bosnia and Herzegovina, possess independent legal person status, be a distributor with experience in producing or supplying the inquired equipment, and possess legal and valid business licenses, tax registration certificates, organization code certificates, etc.
5.2 Financial Capability Requirements: The bidder must have a sound financial status.
5.3 Performance Credit Requirements: The supplier should have a good social reputation, no litigation or arbitration arising from illegal activities in the past 3 years, property not under receivership or frozen, and the enterprise must not be in a state of being prohibited or disqualified from bidding.
5.4 Bidders who are included in the control list or blacklist of the purchaser's superior unit or peer unit within the JiaoRongZhiLian (交融智链) system will be treated as disqualified.
6. Inquiry Announcement and Obtaining Inquiry Documents
6.1 This inquiry announcement is published on the overseas version of the JiaoRongZhiLian (交融智链) system from: <u>15:00 PM, September 18, 2025, to 15:00 PM, September 21, 2025 (3 days)</u>. Suppliers are requested to pay timely attention and participate.
6.2 Obtaining Inquiry Documents: Please participate and download the electronic version of the inquiry documents through the overseas version of the JiaoRongZhiLian (交融智链) system at https://ebs.iccec.cn/ between <u>15:00 PM, September 18, 2025, and 15:00 PM, September 21, 2025 (3 days)</u>.
7. Submission of Quotation Documents
7.1 The quotation documents must be submitted between: <u>15:00 PM, September 18, 2025, and 15:00 PM, September 21, 2025 (3 days)</u>. The submission website is https://ebs.iccec.cn/. Quotation documents submitted online must be in PDF format. All key materials such as qualifications in the documents must be color scans (with official company seal).
7.2 Bidders must register, participate, download inquiry documents, and submit quotations through the announced portal (overseas version of the JiaoRongZhiLian system). Original paper quotation documents do not need to be mailed. The results of this procurement will be based on the online quotation.
8. Bid Opening Time and Location
Bid Opening Time: 15:00 PM, September 21, 2025
Bid Opening Location: Online bid opening
9. Contact Information
Purchaser: CCCC-SHEC-6th Engineering Co., Ltd. Bosnia and Herzegovina Vc Corridor Expressway OP Section Project
Address: Building 29, Enterprise One Park, Western Avenue, Guodu Street, Chang'an District, Xi'an City, Shaanxi Province, China
Contact Person: Wang Yanyu
Phone: 15280595155
Email: 1430181594@qq.com
本招标项目仅供正式会员查阅,您的权限不能浏览详细信息,请点击 登录 或 注册 ,联系工作人员办理会员入网事宜,成为正式会员后方可获取详细的招标公告、报名表格、项目附件及部分项目招标文件等。
联系人:张晟
手 机:13621182864
邮 箱:zhangsheng@zgdlyzc.com